SUCCESSFULLY COMPLETED

·         Pre-project documentation

·         Survey procedures and Method of Statement preparations

·         Scheduling

·         Budgeting

·         General Navigation (provision of survey and positioning equipment including side scan sonar and sub-bottom profiler system).

·         Survey two Half Y-Pieces on each side of the suspended section start points and also survey the anchor platforms

·         Inspection Survey 132 steel Y-Pieces throughout the suspended sections.

·         Position Check of the Anchor Block

·         Supervision for the positioning services and survey personnel on a 24 hour per day basis

·         Multibeam Survey and 3D Bathymetric survey of the 80km long 134 anchor positions