aes@engelement.com

aes@engelement.com

AES | The Element in Offshore & Subsea Engineering
  • Home
  • COMPANY
    • About Us
    • Engineering
    • Innovation & Concept Development
    • Contact Us
  • Offshore Systems
    • Saturated Diving Systems
      • Deep Sea Diving
    • Launch & Recovery Systems
    • Winches
    • Flange Connectors & Couplings
  • Engineering Services
    • Structural Design
    • ANSYS FEA Services
    • Pressure Vessel Design
    • Piping Systems
    • Cathodic Protection
    • Cad/Cam Services
    • Design Verification & Testing (DVT)
    • ABS & DNV Certification
  • PROJECTS
  • Contact Us
  • AQ-VE-AN-BORU-EKLEME

    Completed challenging scopes in the ambitious transnational fresh water pipeline project.

  • 6-Boru-Ekleme-Çalışmaları-21

    Understanding the requirements of the industry while performing risk management throughout each phase of the project is a key to successful completion.

    Y-Piece installation for Offshore Crossing. READ MORE….

  • TRNC-OVERALL-04

    Performed TRNC Fresh Water Supply Project Steel to HDPE 100 joint design, validation, testing & completed ABS certification..

  • SLIDE-32

    Custom designed Y-Piece pipeline joint fabricated from induction bending process in accordance with ABS Subsea Pipeline Code.

    READ MORE…

  • TRNC-OVERALL-05

    Performed challenging scopes in the ambitious transnational fresh water pipeline project..

  • TRNC-OVERALL-021

    AES custom designed Y-Piece pipeline joint fabricated from induction bending process in accordance with ABS Subsea Pipeline Code.

    READ MORE…

  • TRNC-OVERALL-07

    With strong connection to operational reality, We will continue to provide optimal added value to our customers

    SPLIT Bend Stiffener Design

    READ MORE…

  • TRNC-OVERALL-08

    With strong connection to operational reality, We will continue to provide optimal added value to our customers

    SPLIT Bend Stiffener Design

    READ MORE…

  • TRNC-OVERALL-09

    Designed and delivered custom stub end flange solution that is machined from a 1900mm outer diameter and 250mm thick walled HDPE 100. READ MORE…

  • TRNC-OVERALL-023

    AES achieved a design solution with a large diameter PE100 stub end to meet demanding fabrication and assembly tolerances READ MORE…

  • TRNC-OVERALL-022

    Designed and delivered custom stub end flange solution that is machined from a 1900mm outer diameter and 250mm thick walled HDPE 100. READ MORE…

  • TRNC-OVERALL-10

    Completed Transition Anchor Point Design & Dry Fit-Up Tests for a 280msw ROV Intervention. READ MORE….

     

  • TRNC-OVERALL-13

    Transition Anchor Point Deployment. READ MORE….

     

  • TRNC-OVERALL-15

    Completed Half Y-Piece for the anchor point.

  • TRNC-HALF-Y-PIECE-ANCHOR

    Delivered pipeline anchor platform solution for ROV intervention at 280msw depth.

  • TRNC-OVERALL-019

    Performed bend protector analysis and delivered on-bottom crossing joints for the TRNC Project.

  • TRNC-OVERALL-020

    Performed challenging scopes in the ambitious transnational fresh water pipeline project.

  • TRNC-OVERALL-16

    AES will ensure that we continue to provide optimal added value to our customers with our strong connection to operational reality,

  • TRNC-OVERALL-017

    AES will ensure that we continue to provide optimal added value to our customers with our strong connection to operational reality,

  • TRNC-OVERALL-021

    AES will ensure that we continue to provide optimal added value to our customers with our strong connection to operational reality,

  • Home /
  • Projects /
  • Anchor Platform Design & Reinforcement

 





INDEPENDENT AUTHORITIES & ASSOICATIONS AES WORKS WITH

TECHNOLOGY PARTNERS AES WORKS WITH

AES NORTH AMERICA

9006 Jeffrey Road, Great Falls, VA 22066/ U.S.A


AES – EUROPE & MIDDLE EAST REGION

Merkez Mahallesi Çavuşbaşı Yolu, Durmuşoglu Cad. Zeytin Sk. Turkuaz Konakları No:7 Villa No:10 Çekmeköy, 34782 Istanbul İstanbul / TURKEY

© 2023 AES. All Rights Reserved.